Supply Pumps  

Department of Natural Resources, Mines and Energy
Level 32, 400 George Street, Brisbane, QLD, Australia, 4002
BGM021
Goods and Services
Supply Pumps

This contract is for the replacement of pumping infrastructure at Sump 2, located downstream of the main waste rock dump. This system transfers contaminated and acidic seepage from the collection sump into the onsite water storages (main pit or mine water dam).

Inclusions:

  • Supply of two diesel driven pump sets
    • Southern Cross 100x65-315
    • Yanmar 4 cylinder diesel engine
    • Tyre coupling connection mounted on fabricated painted steel base
    • with cover and lift points on four corners
    • Engine to include Auto Stop/Start protection panel kit
    • Fuel pick up and return lines to external fuel tank (adjacent to pumps)
    • 6m x 160mm poly suction line with stainless steel B’Rings and 6 inch 316 foot valve
    • Discharge connection fittings to existing 110mm HDPE pipelines.
  • Supply of one fuel tank
    • 400 litre Mine Go self bunded steel fuel tank
  • Delivery of goods to site
  • Labour to install both units on site

Exclusions:

  • Disconnection and removal of existing pump infrastructure at Sump 2
  • Any earthworks or civil works to pump pad or access
  • Unloading and lifting of new equipment onsite
28 May, 2020
Pumps - (100%)
limited offer process
No
$64,000 (Estimate)
Cairns & Far North Queensland
10 Jun, 2020
Total value of the contract is GST inclusive
0
None

Contractors

Vestend Pty Ltd
40-46 Eclipse Dr, Atherton, QLD , 4883, Australia
Price: $ 0.00