Supply Pumps
This contract is for the replacement of pumping infrastructure at Sump 2, located downstream of the main waste rock dump. This system transfers contaminated and acidic seepage from the collection sump into the onsite water storages (main pit or mine water dam).
Inclusions:
Supply of two diesel driven pump sets
Southern Cross 100x65-315
Yanmar 4 cylinder diesel engine
Tyre coupling connection mounted on fabricated painted steel base
with cover and lift points on four corners
Engine to include Auto Stop/Start protection panel kit
Fuel pick up and return lines to external fuel tank (adjacent to pumps)
6m x 160mm poly suction line with stainless steel B’Rings and 6 inch 316 foot valve
Discharge connection fittings to existing 110mm HDPE pipelines.
Supply of one fuel tank
400 litre Mine Go self bunded steel fuel tank
Delivery of goods to site
Labour to install both units on site
Exclusions:
Disconnection and removal of existing pump infrastructure at Sump 2
Any earthworks or civil works to pump pad or access