Level 32, 400 George Street, Brisbane, QLD, Australia, 4002
WC048A
Goods and Services
Supply of Electrical Goods
DNRME Technical Services has managed the Wolfram Camp abandoned mine since December 2018. Water management is a major risk for the site, and extensive water management infrastructure exists including submersible pumps, gensets, pipework and evaporator fans. Additional electrical components are required to support additional enhanced evaporation onsite, as well as to increase pump capacity from FMN back to the main pit.
A local electrical contractor will be used to ensure that appropriate components are selected and procured, given this is a specialised field. There may be future support required to assist with installation or maintenance, which will be identified progressively over time on an as-needs basis.
18 Jun, 2020
Electrical equipment and components and supplies - (100%)