Communication Room Cooling and Cold Room Systems

Children's Health Queensland (CHQ) is seeking Proposals for the provision of design and construction services for two projects, to enhance the electrical and mechanical resiliance of the Queensland Children's Hospital (QCH) Communication Room Cooling and Cold Room Systems.

This procurement requires the Contractor to complete both projects concurrently within the program.

Communication Rooms Cooling - QCH has fifty (50) Communications Rooms throughout the Hospital . These Communications (Comms) Rooms are air conditioned (AC) by chilled water fan coil units within the space. At present, Many of these fan coil units have insufficient access for breakdown repair works, leaving several Comms Rooms operating on a single AC unit without backup. In addition to this, the main Campus Distribution Rooms do not have a level of reslilience commensurate with their criticality.

This project component involves the update of HVAC equipment within six (6) different rooms.

  • Campus Distribution Room 1
  • Campus Distribution Room 2
  • Communication Room 4A
  • Communication Room 4B
  • Communication Room 6A
  • Communication Room 6B

Works within these spaces vary from the relocation of services blocking AC unit access, to the replacement of Chilled Water Fan Coil Unitis with new In-Row-Coolers.

Cold Room Systems - The purpose of this project component is principally to increase the resilience of the critical Kitchen and Pharmacy Systems. At present, several systems which are critical to the hospital's continued operation have single points of equipment failure, and require a second system to provide N+1 redundancy. Included in this project is the upgrade of several other underperforming systems, the systems requiring new refridgeration N+1 redundancy include:

  • Pharmacy Cool Room - currently served by CU-QCH-02-01
  • Kitchen Cold Room (Freezer) - currently served by CU-QCH-03-01
  • Kitchen Cool Room (Dairy) - currently served by CU-QCH-03-03

The two (2) items requiring increased capacity and replacement include:

  • Kitchen Dry Store - currently served by CU-QCH-03-06
  • Kitchen Under Bench Unit - currently served by CU-QCH-UNDERBENCH

The required work for each of these project components will be comprised of the manufacture, supply, delivery and installation of all works and includes fully documented testing, commissioning, defects liability, warranty and maintenance of the Mechanical Services works.

For detailed information on the specific goods / services sought under this tender, please review Attachment - RFO  Communication Room Cooling and Cold Room Systems Final, along with all referenced attachments.

6 Jul, 2020
Building construction and support and maintenance and repair services - (50%)
Cold storage installations - (50%)
limited offer process
No
$877,330 (Estimate)
South East Queensland
28 Aug, 2020
2
Janet McDonald
OFFICE: (07) 30697132
janet.mcdonald@health.qld.gov.au

Contractors

SABE Services Group
Unit 20, 5-7 Cairns Street, Loganholme, QLD, Australia, 4129
Price: $ 877330.00