View Contract Details

Clay Material Supply  

Department of Natural Resources, Mines and Energy
Level 32, 400 George Street, Brisbane, QLD, Australia, 4002
BGM022E
Goods and Services
Clay Material Supply

The Supplier must provide the Goods and Services specified below to the Customer, in accordance with the Requirements described in this Schedule.

1.   Introduction

The Baal Gammon copper mine, located 8km west of Herberton, is classified as an Abandoned Mine and is currently managed by the Technical Services team within the Department of Natural Resources, Mines and Energy (DNRME). Authorisation to carry out care and maintenance and rehabilitation activities on Abandoned Mines is provided to DNRME Authorised Officers via the Mineral Resources Act 1989 Section 344A.

 

Supply and delivery of 15,000 m3 (BCM) of clay soil material to Baal Gammon Mine – Waste Rock Dump (WRD) upper and middle dump areas, and spreading of clay material across surface of waste rock dump via D6 Dozer.

In scope activities include:

·         Enable escorted quarry access to Customers technical officers to inspect available material, and confirm material to be accepted (see point 3 below for material specification requirements).

·         Test pitting may be required to assist with this requirement, as well as collection of samples by the Customer for external testing.

·         Preparation of a task risk assessment and associated documentation to satisfy legislative requirements and site rules (for work undertaken on Baal Gammon Site), approved by the DNRME representative.

·         Operators entering Baal Gammon to attend site and complete a site induction.

·         Safe excavation of insitu clay material and loading to haulage trucks at suppliers site.

·         Transportation of clay material to the Baal Gammon Mine, in accordance with any local government road rules, requirements, task risk assessment, and other relevant legislation.

·         Paddock dumping of material at the designated Waste Rock Dump unloading areas.

·         Maintenance of access roads between quarry and the mine entrance gate, that are degraded due to haulage requirements, if required.

·         Maintaining and providing records as supporting information for all material movements.

·         Spreading clay material from unloading area across the extent of the waste rock dump, as directed by DNRME personnel (hourly hire / wet hire works).

·         Management of all workplace health and safety requirements throughout the works, as the Principal Contractor.

21 Sep, 2020
Soil - (100%)
limited offer process
No
$563,343 (Estimate)
Cairns & Far North Queensland
1 Oct, 2020
Total Value of the contract is GST inclusive
3
None

Contractors

HTE Mining Pty Ltd
15 Montrose Road, Taringa, QLD , 4068, Australia
Price: $ 0.00