Supply & Delivery of Select Fill CBR15, nominal 150mm Rock, Type 2.1 & 2.3 and 10 & 14mm pre-coat screenings.
REQUIREMENTS
Location: Gum Ck Culvert, locality of Grosvensor
70km north-west of Gayndah & 8km south-east of Eidsvold on Burnett Hwy
- 600 tonne Type 2.1 Pavement Material
- 60 tonne Type 2.3 Pavement Material
- 1200 tonne Select Fill CBR 15 (Provisional Qty, if ordered)
- 40 tonne 150mm nominal rock
- 15 tonne 10mm Pre-Coat Aggregate
- 6 tonne 14mm Pre-Coat Aggregate
- 6 tonne Bedding Sand
Project Specification
General
All work associated with the Offer shall be performed in accordance with the Department’s Technical Standard:
- MRS04 (11/20) – General Earthworks
- MRS05 (11/20) – Unbound Pavements
- MRS22 (07/20) – Cover Aggregate.
- MRS50 (09/20) – Specific Quality System RequirementsSupply & Delivery of Select Fill CBR15, nominal 150mm Rock, Type 2.1 & 2.3 and 10 & 14mm pre-coat screenings.
REQUIREMENTS
Location: Gum Ck Culvert, locality of Grosvensor
70km north-west of Gayndah & 8km south-east of Eidsvold on Burnett Hwy
- 600 tonne Type 2.1 Pavement Material
- 60 tonne Type 2.3 Pavement Material
- 1200 tonne Select Fill CBR 15 (Provisional Qty, if ordered)
- 40 tonne 150mm nominal rock
- 15 tonne 10mm Pre-Coat Aggregate
- 6 tonne 14mm Pre-Coat Aggregate
- 6 tonne Bedding Sand
Project Specification
General
All work associated with the Offer shall be performed in accordance with the Department’s Technical Standard:
- MRS04 (11/20) – General Earthworks
- MRS05 (11/20) – Unbound Pavements
- MRS22 (07/20) – Cover Aggregate.
- MRS50 (09/20) – Specific Quality System Requirements
|