Supply & Deliver road paving materials and screenings to D'Aguilar Highway (Nanango-Kingaroy).
REQUIREMENTS & TIMING
5,000 tonne Type 2.1 Pavement Material
5,000 tonne Type 2.3 Pavement Material
2,000 tonne CBR 10 material
250 tonne 10mm Pre-coated Aggregate
250 tonne 10mm Pre-coated Aggregate
It is generally intended that the paving materials will be delivered directly onto the road surface whereas the screenings will be delivered to stockpile.
|