Supply & Deliver road paving materials and screenings.
REQUIREMENTS
SITE 1: Bruce Highway – 2km south of Torbanlea turnoff
3,000 tonne Type 2.1 Pavement Material
3,000 tonne Type 2.3 Pavement Material
5,000 tonne CBR 10 material
100 tonne 10mm precoated screenings
SITE 2: Ritchie Road Torbanlea
6,000 tonne Type 2.1 Pavement Material
5,000 tonne Type 2.3 Pavement Material
1,000 tonne CBR 10 material
200 tonne 10mm precoated screenings
250 tonne 14mm precoated screenings
It is generally intended that the paving materials will be delivered directly onto the road surface and screenings into stockpile.
Timing:
It is anticipated that works will be commencing in late April and continuing through to September 2022
|