Supply & Deliver road paving materials and screenings.
REQUIREMENTS & TIMING
1,000 tonne Type 2.1 Pavement Material
2,500 tonne Type 2.3 Pavement Material
250 tonne CBR 10 material
50 tonne 10mm precoated screenings
110 tonne 14mm precoated screenings
It is generally intended that the paving materials will be delivered directly onto the road surface, with screenings into stockpile
|