Display GE00441

For more detailed information on a particular section refer to the help specific to that section.

Times presented in this website are for Queensland (without daylight saving).

Detailed Help (Clicking detailed help will open a new browser window)
Dual Barge Ramps Jetty - Steel Headstocks and Piles

Issued by Ports North

Invitation to Offer

Status: Current
Mega Category: Transport infrastructure and services
Number: GE00441
Released: Fri, 7 Feb 2020 at 9:41AM Brisbane, Queensland
Closing: Fri, 6 Mar 2020 at 12:00PM Brisbane, Queensland
UNSPSC: Building and Construction and Maintenance Services - (100%)
Region/s: Cairns & Far North Queensland

Section 1

Tender Overview

Ports North (PN) is responsible for the development and management of port facilities vital to the development of Cairns and regional centres in Far North Queensland.  The Corporation has extensive property, marina, tourism and cargo facilities in Cairns and its regional ports.

PN owns and maintains the Dual Barge Ramps located on Smith’s Creek in the Cairns Seaport. There is a concrete jetty at the Dual barge Ramps that consists of a concrete deck on steel headstocks supported by steel piles. The steel headstocks and the steel piles are corroding above the waterline and the existing protective coatings are no longer effective.

The works being tendered include surface preparation and application of paint coatings to 3 headstocks and 6 steel piles  from mid-tide level to the top of the pile. The works may involve repairs to the steelwork that will include welding and steel plate replacement or compensation plates.

The jetty is adjacent to an operational barge ramp with existing services in place. Safety, methodology and programming will be critical to the successful delivery of the project. The works will require provision of appropriate access and environmental controls for works in such tidal zones.

Ports North invites tenders from suitably qualified and available Contractors, with appropriate experience in the preparation for, and application of, high quality marine paint systems for the delivery of this project.

More about tendering here

Section 2

Still need help? Contact Us


Other Contacts
users Michael Martin
Type Technical
phone PHONE: (07) 40523886
email michael.martin@portsnorth.com.au

Section 3

Here is the detail

If there are no documents listed in this section, please refer to Section 1 Tender Overview.

Documents can not be downloaded once Tender has closed.


Section 4

All finished? Please check and submit your response here

Give yourself the best chance

Step 1
Read through the tender description in Section 1
right arrow Step 2
Review the detailed tender information in Section 3 (if any)
right arrow Step 3
Complete ALL required tender documentation
right arrow Step 4
Check for quality in ALL your tender documentation

Closes at Fri, 6 Mar 2020 at 12:00PM Brisbane, Queensland

Submit your response in hardcopy to Cnr Hartley & Grafton Streets, Cairns Qld 4870.

Section 5

Please help us to improve

The State Government is transforming the way we procure, including reducing red tape for our suppliers. Part of this is to reduce the complexity and the time it takes to complete tenders.

Complete Survey