Display TMRPMG031920For more detailed information on a particular section refer to the help specific to that section. Times presented in this website are for Queensland (without daylight saving). Detailed Help (Clicking detailed help will open a new browser window) |
| ||||||||||||||||||||||||||||
Section 1 |
Tender Overview |
---|
The Queensland Government is seeking Proposals for TMRPMG 03 1920. Complying with Test Method Q138A: Preparation and compaction of laboratory mixed foamed bitumen stablised material. The mandatory requirements are: Bitumen foaming unit, capable of manufacturing foamed bitumen with a minimum expansion ration of 10 and a minimum half-life of 20 seconds, heating bitumen between 140° and 180°C, maintaining bitumen temperature to within 2°C of set temperature, adding water to bitumen at rates between 0 and 5% by bitumen mass and control bitumen flow and water settings. The plan is to be configurable to measure the characteristic of the foamed bitumen produced (expansion ration and half-life) For detailed information on the specific goods / services sought under this tender, please review the "Request for Quote" in "Section 3 - Here is the detail". |
Section 2 |
Still need help? Contact Us |
---|
|
Section 3 |
Here is the detail |
---|
If there are no documents listed in this section, please refer to Section 1 Tender Overview. Documents can not be downloaded once Tender has closed. |