Published 19 Aug, 2020
|
|
10. WHS Notice of Impacting Activity
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
1a. Annexure A - DDH Project Management Scope of Works - Chinchilla Generator Replacement
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
2. IH189900-Electrical - SPC-00-000C
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
3. 4-04-057 - asbestos management plan
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
4. Attachment P Working with and Removal of Asbestos Containing Material
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
6. Chinchilla Hospital Communications Pit Conduit Map - Proposed 2012
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
7. Site Specific Instructions Induction update August 2020
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
8. Qld Health ICT Cabling Standard V3.0
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
9. WHS Work Area Access Permit
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
5. Asbestos Register Certificates of analysis
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
5. Asbestos Register Data
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
5. Asbestos Register Site Plans
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
5. Asbestos Register Photos 1
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
5. Asbestos Register Photos 2
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
11. Verified Contractor Management Onboarding Pack
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
1. Chinchilla Generator Tender 2020
(Ver 1 - 19 Aug, 2020)
Available by Download
|
|
Returnable Form 4 - Pricing
(Ver 1 - 19 Aug, 2020)
Available by Download
|
Published 20 Aug, 2020
|
|
Returnable Form 4 - Pricing - Version B
(Ver 1 - 20 Aug, 2020)
Available by Download
|
|
Addenda 1 20200820 New Version Returnable Form 4 - Pricing
(Ver 1 - 20 Aug, 2020)
Available by Download
|
|
Clarification 1 20200820
(Ver 1 - 20 Aug, 2020)
Available by Download
|
Published 28 Aug, 2020
|
|
Clarification 2 - Chinchilla Generator Replacement - Tender Queries A
(Ver 1 - 28 Aug, 2020)
Available by Download
|
|
Clarification 2 20200828
(Ver 1 - 28 Aug, 2020)
Available by Download
|
Published 1 Sep, 2020
|
|
Addendum 2 Chinchilla Switch Board
(Ver 1 - 1 Sep, 2020)
Available by Download
|
|
Addenda 2 20200901 Main Switch Board Drawings
(Ver 1 - 1 Sep, 2020)
Available by Download
|
|
Clarification 3 20200901 Conduit
(Ver 1 - 1 Sep, 2020)
Available by Download
|