Display LINC086

For more detailed information on a particular section refer to the help specific to that section.

Times presented in this website are for Queensland (without daylight saving).

Detailed Help (Clicking detailed help will open a new browser window)
Well Pressure and Temperature Monitoring Telemetry System

Issued by Department of Natural Resources, Mines and Energy

Invitation to Offer

Status: Awarded
Mega Category: General goods and services
Number: LINC086
Released: Tue, 8 Sep 2020 at 7:41AM Brisbane, Queensland
Closed: Mon, 21 Sep 2020 at 6:00PM Brisbane, Queensland
Awarded: Wed, 25 Nov 2020 at 12:00AM Brisbane, Queensland
UNSPSC: Telemetry systems - (100%)
Region/s: South West & Darling Downs

This Tender has been awarded - please click here to view the Contract details.

Section 1

Tender Overview

The Department of Natural Resources, Mines and Energy (DNRME) manages the former Underground Coal Gasification (UCG) Site at Hopeland, Queensland.

In accordance with the site management requirements, 7 (seven) wells were drilled across the site to monitor the Macalister A and B seams of the Walloon Coal Measures and the overlying Springbok Sandstone for impacts resulting from previous UCG activities. 

DNRME is looking for a suitable supplier who will design, manufacture, install remote data acquisition and control system for the wells, and maintain it periodically.

It is expected that telemetry units will be installed at each well location.  Confirmation is required as to whether nested well locations (i.e. NB01D and S, and NB02D and S) can be served with one single data acquisition unit.

The data acquisition and control system must

  • Be readily operatable and serviceable with a warranty (relevant certificates must be provided);
  • Be reliable and readily repairable with acceptable delays;
  • Be sufficiently robust under local environmental conditions;
  • Be self‑power efficient with practical standby time;
  • Be an engineered system compliant with relevant state and national guidelines and standards;
  • Have functionality and capability to acquire pressure and temperature data which is recorded by downhole pressure and temperature gauges installed in each well;
  • Have functionality and capability to acquire and record wellhead pressure from calibrated digital pressure gauges or other sensors.  These gauges and sensors must be supplied and installed by the Supplier;
  • Be able to estimate static groundwater levels for each well, using pressure data with gas and temperature correction functions;
  • Have capacity to record data at a range of time intervals between 1 second and 1 day;
  • Allow data acquisition intervals to be readily adjusted remotely;
  • Have ramping function for data acquisition if significant changes are detected in a well;
  • Have functionality to transmit acquired data to a nominated cloud base data storage system (to be proposed by the contractor);
  • Have functionality and capacity to allow the Customer to, inter alia:
  • Access the data storage system vie internet browser with access control protocols;
  • Access data;
  • Monitor data on-line;
  • Select data of interest;
  • Visualise data of interest;
  • Change record data intervals; and
  • Download data in a readily manipulable format; and
  • Be serviced and maintained at agreed time intervals.

More about tendering here

Section 2

Still need help? Contact Us


Other Contacts
users Rebecca Vickers
Type Contractual
email rebecca.vickers@dnrme.qld.gov.au
users Krzysztof Oracz
Type Technical
email krzystof.oracz@dnrme.qld.gov.au

Section 3

Here is the detail

If there are no documents listed in this section, please refer to Section 1 Tender Overview.

Documents can not be downloaded once Tender has closed.