Yurika Pty Ltd (a member of the Energy Queensland group of companies) invites Tenderers to submit Tenders in accordance with the Tender Documents for the contract listed in Item 2 of Section 1 - Invitation to Tender Reference Schedule.
BACKGROUND
Territory Generation is undertaking the construction of a new 66 kV connection from Owen Springs Switchyard (owned and operated by PWC) to the new Joint Defence Facility Pine Gap (JDFPG) facilities. The scope of works for Yurika Pty Ltd (Yurika / Principal) comprises design, supply, constructions works, bulk earthworks (including civil/supports, plant, equipment), installation and commissioning works.
SCOPE
The Contractor is required to construct the civil works for the greenfield 66/11 kV substation, outside Alice Springs (Pine Gap Substation – Separable Part 2), as per the drawings, specification and all documents reference in the specification. The Contractor`s attention is in particular referred to Territory Generation document titled ‘Part 2 – Design and Construction Contract Works Description’.
It is recommended that Tenderer's attend the Tender Information Session / SIte Visit (TIS) to be held on Wednesday 10 February 2021 at 10.00am. The location of the Pine Gap Substation is Hatt Road, off the Stuart Highway, 25km south of Alice Springs.
Further details, including the technical specification, drawings and associated documentation are contained in the attached Tender Pack.
|
More about tendering here
|