Display CBE14For more detailed information on a particular section refer to the help specific to that section. Times presented in this website are for Queensland (without daylight saving). Detailed Help (Clicking detailed help will open a new browser window) |
| ||||||||||||||||||||||
This Tender has been awarded - please click here to view the Contract details. |
Section 1 |
Tender Overview |
---|
The Bloodwood Creek Underground Coal Gasification (UCG) site (the Site) became an abandoned mine in March 2019, following the disclaiming of mining tenures held on the land. Both surface and sub-surface infrastructure remains on site, including several wells for UCG processes and water monitoring, a gathering network, process water management equipment and a power generation plant with associated infrastructure. These items present health, safety and environmental risks that need to be assessed and managed by Technical Services (TS), in line with the Abandoned Mines Management Policy. This aims to remove all redundant plant, equipment, buildings, and infrastructure to render the site in as safe a condition as practicable.
|
Section 2 |
Still need help? Contact Us |
---|
|
Section 3 |
Here is the detail |
---|
If there are no documents listed in this section, please refer to Section 1 Tender Overview. Documents can not be downloaded once Tender has closed. |