Display 104494For more detailed information on a particular section refer to the help specific to that section. Times presented in this website are for Queensland (without daylight saving). Detailed Help (Clicking detailed help will open a new browser window) |
| ||||||||||||||||||||||
This Tender has been awarded - please click here to view the Contract details. |
Section 1 |
Tender Overview |
---|
BMS Controls System are used to monitor and control the ventilation and air conditioning system on the campus maintaining the internal building conditions to their predetermined set points. The System also controls the chiller plant used to cool chilled water which is circulated throughout the campus and supplied to the air handling units, the charge/discharge cycle of the chilled water storage tank, monitor power consumption for the site and controlling chiller operations to stay below the site power limit. The BMS Controls Maintenance is to provide the ongoing servicing, calibration and adjustment of the controllers and sensors that are part of the system, to ensure it functions on-demand, within its design and program parameters as well as to identify any sensor faults and errors or equipment and controller which is operating incorrectly so that they can be repaired, recalibrated or adjusted to function as programmed. Release: 06 July 21 Due to the site visit being conducted 13 July 21 there have been numerous questions received. This RFQ is to be extended in accordance with the below: Questions Close: Close: There will be a site visit conducted on Tuesday 13th July 2021 at 1030 - The contact is Phil Smith Meeting Location: Cairns Estate Office Building A4019 |
Section 2 |
Still need help? Contact Us |
---|
|
Section 3 |
Here is the detail |
---|
If there are no documents listed in this section, please refer to Section 1 Tender Overview. Documents can not be downloaded once Tender has closed. |