Local Permanent Marks (PM) are required to be installed close to Stream Monitoring Gauge tower structures. Given the PMs will be located within the floodplain area, the Local Permanent Marks must be deep driven stainless steel rods. These rods should be mechanically driven to refusal.
Work to be completed between January and May 2022
Interested Suppliers must have a physical presence in Queensland (PO Box not acceptable); the relevant insurances; declare any potential Conflicts of Interest and meet the Queensland Government Ethical Supplier Threshold.
Please complete and sign Section 2 Of the RFQ Document: Supplier Response and upload your response via QTender.
Refer to Attachment B of the RFQ Document for Conditions of Offer.
Any contract awarded will be under the General Goods and Services Contract Conditions - see attached.
***UPDATE***
PSMs can be installed once civils complete.
AO1 Civils
All councils: 11 Oct 21 to 14 Feb 22
AO2 Civils
Cairns: 15 Feb 22 to 01 Mar 22
Douglas: 21 Mar 22 to 28 Mar 22
Cassowary: 16 Feb 22 to 23 Feb 22
Mareeba: 21 Mar 22 to 28 Mar 22
Cook, Mapoon, Lockhart River: 27 Apr 22 to 11 May 22
AO3 Civils
Majority of assets will be installed/commissioned by end of 2021
Remaining civils approx. complete by end of Jan 2022
Note that QRA reserves the right to amend these dates. Successful vendor will need to be flexible enough to work around date changes if required.
***UPDATE 1/12*** ALL Q&As have been uploaded
|