RoadTek are required to undertake the replacement of the Hut Creek timber bridge on Blue Mountain Road, Mackay. The bridge will be replaced with a single span, pre-stressed concrete bridge.
As part of the above works we are calling tenders for a suitably qualified subcontractor to assist with installation of the bored piles single span concrete bridge. The works will be in accordance with the Project Drawings, TMR Standard Drawings and TMR Specifications.
The works will involve the tenderer providing the necessary personnel, materials, plant, tools and equipment to carry out the works. The tender package offered is based on a Schedule of Rates style arrangement due to the project resourcing requirements of the works.
All works shall be in accordance with the relevant and current versions of the Transport and Main Roads Specifications and attached project specific documentation. The works shall be carried out under the RoadTek Works Contract.
1. Scope, Timing and Programme of Work
The anticipated start date for the works is early March 2022 and the completion of the
works is planned for 30 March 2022. Please note that if tenderer is unable to meet this
program please nominate an alternative program for the work.
- The scope of this package is for the supply and installation of bored piles and will cover the following construction activities:
- Mobilisation to site
- Daily travel to site
- Adequate experienced site supervision of the works
- The supply of all labour, materials (Excluding Reinforcing steel cages and steel liners), plant and equipment necessary to install the bored piles. Refer to the attached Geotechnical Report for the works.
- Demobilisation from site
For detailed information on the specific goods / services sought under this tender, please review the "Specification Documents" in "Section 3 - Here is the detail".
|